Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

May 30, 2019     6-2 step 4 - 5 VS assemple rear spar and match drill - (1.5 hours)       Category: Tail Feathers
deburring all component, assemble all the parts including VS-1008 Spar Doubler and match drill with #30 drill all hinge brackets, hinge doubler and all the spar doubler and spart caps 1/8"" holes disassemble and deburr all parts

Match drill the upper attach bolto holes on rear spar, rear spar doubler into the Left and Right Spar caps with a 3/16"" drill

DONT FINAL DRILL holes #12 as this is done when VS is fitted to the tailcone


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.